Nevin Cabin

Carbon Community Consumption Health Nature Resilience Spirit

A two-storey, 5-module, 1,350 sqft, pre-fabricated wood-framed off-grid cabin.

Location

Gambier Island , British Columbia, Canada


Scope

Preliminary Design, Detailed Design, Construction Services


Disciplines

Structural,


Engineers

Mark Fleischhaker, P.Eng.


Design Completed

August 2018


Construction Completed

September 2022